The consultative engagement process being started by President HAKAINDE HICHILEMA, according to energy expert JOHNSTONE CHIKWANDA, will settle outstanding issues in the sector.
According to Dr. CHIKWANDA, the energy sector has been facing the same problems in the electrical and petroleum subsectors.
He claims that in order to increase the nation’s electricity production, the 2,400 megawatt Batoka Gorge Power Project must be backed and hastened.
He added that it is in the public interest to address the legal disputes over the Luapula River’s water body rights, which have delayed the development of a sizable hydroelectric plant for a number of years.
According to Dr. CHIKWANDA, the government should also think about creating a master plan for the nation’s pipelines that will direct and influence future pipeline projects.
In an interview with ZNBC news, Dr. CHIKWANDA stated that the Industrial Development Corporation (IDC), a shareholder in Indeni, must provide financial support to the facility in order for it to make investments in ethanol blending and production machinery.
Another energy expert, BORNFACE ZULU, advised the government to consider domestic production of wind turbines and solar panels in order to alleviate the nation’s power generation problems.

President Hakainde Hichilema Mourns the Passing of Edgar Lungu
Edgar Lungu has Died
President Hichilema Pays Tribute to Pope Francis at Solemn Requiem Mass
Government Intensifies Soil Analysis Campaign to Boost Agricultural Productivity
Teenage girl found dead near Kamwala South Secondary School, police launch investigations
Vice President calls for stronger engagement between UNZA management & student leaders
President Hichilema sets 1,000 megawatt solar energy target for 2025
RPP backs Vice President’s call to accelerate national gender policy implementation
Kariba North Bank Power Station to boost generation with increased water allocation