The almost 40 kilometers-long damaged portion of the Tuta Road in the Bangweulu plains must be urgently rebuilt, according to a directive given to the Road Development Agency (RDA).
According to Mr. MILUPI, the damaged section of road has turned into a risk for drivers and requires immediate treatment.
He had just examined the road and was chatting.
Moreover, RDA Board Chair MULCHAND KUNTAWALA stated that the Agency will swiftly mobilize resources to guarantee that work on the damaged stretch begins as soon as feasible.

President Hakainde Hichilema Mourns the Passing of Edgar Lungu
Edgar Lungu has Died
President Hichilema Pays Tribute to Pope Francis at Solemn Requiem Mass
Government Intensifies Soil Analysis Campaign to Boost Agricultural Productivity
Teenage girl found dead near Kamwala South Secondary School, police launch investigations
Vice President calls for stronger engagement between UNZA management & student leaders
President Hichilema sets 1,000 megawatt solar energy target for 2025
RPP backs Vice President’s call to accelerate national gender policy implementation
Kariba North Bank Power Station to boost generation with increased water allocation